GSM-R radio network system is planned to be implemented along 935 km of the main railway lines, consisting of the main international corridors and other TEN-T lines (Phase 1 of GSM-R implementation on the Hungarian railway network). The project consists of procurement and commissioning of the required fixed and mobile equipment, including assembly, system integration, training, start-up, and operational and maintenance support.
The project contributes to the objective of promoting sustainable transport on the TEN-T core and comprehensive networks, with an expected increase in rail usage thanks to a shift from road to railways.
The investments are part of the transport operational programme 2007-2013, which underwent a strategic environmental assessment (SEA) procedure and the environmental effects were assessed. Given the nature of the project, it falls under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) and the need for an EIA must be verified at allocation stage. For this major project, a preliminary environmental impact assessment was performed. On the basis of the findings of this assessment, the competent authorities decided to screen out the implementation of the GSM-R system project from completing a full EIA procedure. The environmental permit has been issued for this project, which is not expected to have any impact on Natura 2000 sites.
The promoter is a public company obliged to comply with European and national public procurement legislation. All of the works and services related to the implementation of the project have already been procured accordingly. The construction works and associated supervision were procured by the promoter in accordance with Directive 2004/18/EC. All the bid notices for construction and services were published in the Official Journal of the European Union (OJEU) and all the contracts have been awarded and signed.
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).
Documents
General enquiries and comments
The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.
Media enquiries
Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.
Complaints mechanism
Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.
Zero tolerance against fraud and corruption
The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.
Related publications