Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Summary sheet

    Release date
    9 October 2013
    Status
    Reference
    Approved | 06/12/2013
    20120166
    Project name
    Promoter - financial intermediary
    D1 FRICOVCE-SVINIA
    The project promoter is the Slovak Republic and is being implemented by the Slovak National Highway Company: Narodna dialnicna spolocnost, a. s.(NDS).
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 15 million
    EUR 131 million
    Location
    Sector(s)
    Description
    Objectives

    Major project under "NDP Framework Loan II" (2006-0030). The project consists of the construction of approximately 11.2km of a new dual carriageway motorway section, as part of the D1 motorway, between Fricovce and Svinia in eastern Slovakia.

    The D1 motorway is part of the core road, trans-European transport network (TEN-T) that runs west-east in Slovakia connecting Bratislava, Zilina, Presov and Kosice to the border with Ukraine. The motorway section is configured as a dual 2-lane motorway with central reservation, emergency lanes and soft verges across a standard platform width totalling 26.5m. The project Fricovce - Svinia includes 15 bridges / viaducts of approximately 2.8km total length, over 4km of retaining walls and 3.5km of noise barriers. There are no interchanges, service areas or maintenance centres proposed on the section.

    Environmental aspects
    Procurement

    The project was included in the Operational Transport Programme 2007-2013 for Slovakia, which falls within the scope of the SEA Directive 2001/42/EC. The project is a class of development that is included under Annex I of the EIA Directive 85/337/EEC (as amended) and an EIA was undertaken. Positive environmental decisions have been issued by the national competent authorities. The projects effect on NATURA 2000 sites (if any significant) will be assessed at appraisal.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Directive 2004/18/EC and Dir. 2007/66/EC, with publication of tender notices in the EU Official Journal, as and where required.

    Related projects
    Parent project

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - D1 FRICOVCE-SVINIA
    Publication Date
    17 Dec 2014
    Document language
    Main Topic
    Lending
    Document Number
    49161219
    Document Focus
    Environmental Information
    Project Number
    20120166
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - D1 FRICOVCE-SVINIA
    Publication Date
    11 Nov 2016
    Document language
    Main Topic
    Lending
    Document Number
    66930691
    Document Focus
    Environmental Information
    Project Number
    20120166
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links
    Summary sheet
    Parent project

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications