Summary sheet

Release date
7 March 2013
Status
Reference
Approved | 04/12/2012
20110583
Project name
Promoter - financial intermediary
OPTIM H DVORISTE-C BUDEJOVICE LINE
Ministry of Transport of the Czech Republic Managing Authority of the Operational Programme of Transport in the Czech Republic
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
CZK 336 million (EUR 14 million)
CZK 1359 million (EUR 55 million)
Location
Sector(s)
Description
Objectives

Optimisation of Horni Dvoriste state border - Ceske Budejovice railway line. The project consists of the optimisation of a 57 km long, single track railway section from Horni Dvoriste; to Ceske Budejovice located on Corridor IV south of Prague. Corridor IV is a 214 km long TEN railway line from Hostivar station in Prague to Horni Dvoriste near the Austrian border. The allowed speed will be increased from 70 km/h to 90 km/h for conventional trains and to 100 km/h for trains with tilting technology. The loading capacity of the line will be increased from UIC category D3 to category D4.

The project concerns the refurbishment of existing infrastructure, in particular sub- and superstructure works on an existing single railway track, as well as the construction or reconstruction of bridges on the TEN-T railway Corridor IV. The project represents an optimisation of capacity and performance of the existing infrastructure for passenger and freight. It also encompasses an improvement of infrastructure safety and reliability.

Environmental aspects
Procurement

The project falls under Annex II of the EIA Directive 2011/92/EU, according to which the need for a full EIA is decided on a case-by-case analysis by the Competent Authority. In this case, the competent authority issued a screening out decision in 2003. Based on a statement issued by the Competent Authority, the project is not likely to have significant effects on Natura 2000 sites. Environmental mitigation measures, in particular noise barriers, representing some 16 % of total project cost, were needed for minimizing or compensating negative environmental impacts.

EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). The main contract was published in the OJEU under the reference number 2007/S 165-204581 on 29.8.2007. The procurement process is accountable under the Cohesion Funds regulations and is acceptable to the Bank.

Related projects
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications