    Summary sheet

    Release date
    3 September 2012
    Status
    Reference
    Approved | 24/07/2012
    20110290
    Project name
    Promoter - financial intermediary
    RAILWAY CORRIDOR IV (BORDER - KM 614)
    Romanian National Railway Company "CFR" - S.A.
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 50 million
    EUR 290 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the rehabilitation and upgrading of the existing railway line between the Romanian-Hungarian border and km 614 (Pan European Corridor IV) over approximately 41km, increasing line speed from 120 to 160km/h. Co-financing of structural and cohesion funds supported projects in Romania under the Sectoral Operational Programme - Transport (SOPT).

    Together with significant rehabilitation and upgrading of TEN-T Priority Project 22 (PP22) Railway Axis Nürnberg/Dresden-Constanta, implemented concurrently in several Member States, the project will enable the railways to improve interoperability, efficiency and competitiveness against other modes – helping the railways to continue providing a comparatively more sustainable transport alternative in future, in line with EU policy.

    Environmental aspects
    Procurement

    The project was classified in Annex II of the Directive 85/337/EEC on Environmental Impact Assessment (EIA) as subsequently amended by Directive 2011/92/EU. The project was therefore the subject of a case-by-case determination of the need for EIA, as part of an EIA screening procedure carried out by the relevant competent authority, the Local Environmental Protection Agency (LEPA) Arad, which concluded that an EIA is not required. Concerning the main impacts, the environmental authority imposed mitigation measures related to protection of water, air, and soil and waste management, particularly during construction. Noise protection measures have also been defined, particularly for the area around Arad station.

    The promoter, CFR, is subject to the EU Directives on procurement. The procurement process for the works was based on a two-stage approach, with a first pre-qualification stage followed by a submission of offers by the pre-qualified tenderers. The losing bidder contested the outcome of the tender, but at the end of this process its claim was rejected by the Romanian courts.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - RAIL BORDER-KM 614 (FL20080170)
    Publication Date
    23 Apr 2015
    Document language
    Main Topic
    Lending
    Document Number
    58589461
    Document Focus
    Environmental Information
    Project Number
    20110290
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - RAIL BORDER-KM 614 (FL20080170)
    Publication Date
    1 Jan 2019
    Document language
    Main Topic
    Lending
    Document Number
    88620422
    Document Focus
    Environmental Information
    Project Number
    20110290
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications