Search En menu en ClientConnect

Signature(s)

Amount
€ 150,000,000
Countries
Sector(s)
Morocco : € 150,000,000
Energy : € 150,000,000
Signature date(s)
27/12/2007 : € 150,000,000
Link to source

Summary sheet

Release date
13 June 2007
Status
Reference
Signed | 27/12/2007
20070082
Project name
Promoter - financial intermediary
One-Projets Hydroélectriques II
Office National de l’Electricité.
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 150 million.
EUR 335 million.
Location
Sector(s)
Description
Objectives

Creation and extension of hydropower schemes (in particular: construction of a pumped storage power station in Abdelmoumen; extension of the Afourer pumped storage power station; construction of a hydropower plant at Tillouguit) plus the installation of remote management systems at existing hydropower plants.

To optimise the operation of ONE’s power generation plant and reduce production costs by storing power generated at off-peak times in order to meet the requirements of a heavy load curve at peak times.

Environmental aspects
Procurement

The hydropower schemes under the project would fall under Annex II of the Environmental Impact Assessment Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC if located within the EU. This would leave it to the competent national authority to determine the requirement for an EIA based on the screening criteria specified in Annex III of the same directive.

According to national legislation for such a project, the environmental authorities require the promoter to prepare an environmental impact assessment (EIA), including an environmental action plan. The high voltage power lines connecting the schemes to the grid will probably also be subjected to an EIA. Studies will be carried out during appraisal to verify that the project is in line with EU environmental and social procedures, subject to local conditions and law.

By virtue of substituting for alternative fossil fuel-fired generation and thereby contributing to a reduction in greenhouse gases, the hydropower project may be eligible for registration under the Kyoto Protocol.

The Bank will ensure that the promoter implements the project in accordance with the EIB’s Guide to Procurement.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - One-Projets Hydroélectriques II - Project de Station-transfert d'energie par pompage d'Abdelmoumen
Publication Date
7 Mar 2016
Document language
Main Topic
Lending
Document Number
63114703
Document Focus
Environmental Information
Project Number
20070082
Sector(s)
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications