Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20240805
Release date: 29 January 2025

Promoter – Financial Intermediary

HYPO NOE LANDESBANK FUER NIEDEROESTERREICH UND WIEN AG

Location

Description

The operation will finance the reconstruction following the severe floods in Austria, as well as preventive measures to enhance flood resilience against future floods, of small and medium-sized enterprises (SMEs), mid-caps and public sector entities (PSEs).

Additionality and Impact

This MBIL will be the second project under the Floods Emergency Recovery and Resilience Lending Envelope (Serapis 2024-0662) and it will finance preventive measures to enhance flood resilience against future floods, as well as reconstruction works following the severe flood events in Austria in September 2024.


The operation will contribute to EU and national policy objectives, and the intervention will thus generate positive environmental externalities and increase resilience against future climate shocks, particularly floodings. The operation foresees that 75% of the investment volume will be dedicated to Climate Action projects, and more particularly Climate Adaptation.


The Promoter will use the funding to provide loans in favour of PSEs, SMEs and MidCaps which will help them to access finance in a difficult economic environment.


The EIB's financial contribution includes the possibility of flexible drawdowns, long grace periods and fixed interest rate periods, as well as no requirements for complementarity. In terms of non-financial contribution, the EIB will support the intermediary in building and strengthening its capacity to finance climate adaptation projects.

Objectives

The aim is to finance small/medium projects carried out by the final beneficiaries.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 50 million

Total cost (Approximate amount)

not applicable

Environmental aspects

The proposed operation falls within the scope of the EIB's Environmental and Social Standards - "Standard 11 Intermediated Finance" procedures. A detailed assessment of the Promoter's E&S procedures and capacity acc. to the Standard 11 standards still needs to be carried out.

Procurement

Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

Status

Signed - 10/06/2025

Milestone
Under appraisal
Approved
Signed
28 March 2025
10 June 2025

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Austria EU Countries Credit lines