Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20230893
Veröffentlichungsdatum: 10 Juli 2024

Projektträger – zwischengeschaltetes Finanzinstitut

EMPRESAS PUBLICAS DE MEDELLIN ESP

Ort

Beschreibung

Loan to the public sector entity EPM (Empresas Publicas de Medellin) to finance their pipeline of water and sanitation, and energy generation projects in Colombia.

Ziele

The project supports the development of important social and economic infrastructure. It supports water supply, improved sanitation and energy access beyond the borders of the European Union. It is in line with the latest Water Sector Orientation. This operation is in line with EU priorities for Colombia and eligible under the EIB Global Financial Facility (GGF), as it contributes to climate change adaptation and mitigation, as well as to the development of social and economic infrastructure, specifically water and sanitation and energy, by promoting water management, as well as renewable energy generation infrastructure. The proposal contributes to the Team Europe Initiative (TEI) "Green Alliance". The operation is also aligned with the energy objectives of the Global Gateway Investment Agenda in Colombia.

Sektor(en)

  • Energie - Energieversorgung
  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

USD 450 million (EUR 403 million)

Gesamtkosten (voraussichtlicher Betrag)

USD 900 million (EUR 807 million)

Umweltaspekte

The Promoter will be required to implement and operate the investments in conformity with national laws, as well as EIB's Environmental and Social Standards. The project intends to bring environmental benefits by pollution abatement in water bodies and mitigate climate change through the reduction in emissions due to more efficient wastewater treatment. Most of the schemes to be financed under the framework loan are expected to have limited environmental and social impacts. If located in the EU, some of the schemes would fall under Annex II of the EIA Directive 2011/92/EU (amended by the EIA Directive 2014/52/EU), requiring the competent authorities to determine whether an environmental impact assessment (EIA) is required. Where a formal EIA is required (or would be required, were the scheme located in the EU), a copy of the Environmental & Social Impact Study and the Non-Technical Summary (NTS) will be provided to the Bank. The Promoter will also be required to verify that none of the schemes submitted for financing by the Bank have a significant negative impact on any site of nature conservation importance. The Promoter has experience regarding compliance with standards and procedures from other international financial institutions, more specifically with World Bank and Inter American Development Bank. However, this is the first direct EIB operation with EPM. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, climate adaptation and sustainable use and protection of water and marine resources.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement

Projektstatus

In Prüfung - 1/02/2024

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Kolumbien Energie Wasser, Abwasser