Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20220718
Veröffentlichungsdatum: 12 Juni 2024

Projektträger – zwischengeschaltetes Finanzinstitut

CENTRAL REGION WATER BOARD,LILONGWE WATER BOARD,NORTHERN REGION WATER BOARD,SOUTHERN REGION WATER BOARD

Ort

Beschreibung

The Framework Loan (FL) will support the Malawi Water sector, including, amongst others, renewable energy facilities. In particular, the FL will allow 4 of the 5 Malawian Regional Waterboards to further improve: (i) Access-to-water in low-income areas (ii) Improve operational efficiency (iii) Reduce greenhouse gas emissions (iv) Increase drought resilience The planned investments in all 4 waterboards will finance: 1. Energy efficient (water) pumps coupled to renewable energy sources (mainly photovoltaic plants) 2. Increase of water storage capacities 3. Water distribution systems including water kiosks and house connections in low-income areas 4. Targeted investments to improve operational efficiency, e.g., SCADA systems, improved meter reading capabilities 5. Organisational development- and improvements regarding transparency of the water boards.

Ziele

The project is a strategic investment for the government of Malawi and a key priority in the Government's plan to tackle high poverty levels, raising inequalities and improving health. It is also is in line with Sustainable Development Goal #6 (which calls for ensuring availability and sustainable management of water and sanitation for all).

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 96 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 192 million

Umweltaspekte

Environmental and Social Assessments will be carried out as part of the preparatory activities for some of the investments requiring such analysis. Resettlement Action Plan will be carried out as needed. The project shall have positive environmental and public health impacts and will allow the population to improve its access to potable water. The EIB will verify the environmental and social aspects and impacts of the project components, as well as proposed mitigation and compensation measures, in accordance with EIB's Environmental and Social standards. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation and sustainable use and protection of water and marine resources.

Auftragsvergabe

The promoter has to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Genehmigt - 9/07/2024

Milestone
In Prüfung
Genehmigt
9 Juli 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Malawi Wasser, Abwasser