Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20220647
    Veröffentlichungsdatum: 16 Dezember 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    IREN SPA

    Ort

    Beschreibung

    The loan will finance the promoter's 2022-2026 water and wastewater investment programme.

    Additionality and Impact

    The project will support investments in water and wastewater infrastructure in the Liguria Region in Italy.

    In doing so, it will ensure compliance with key European regulations in the water sector, and improve the quality and resilience of water and wastewater water services. The project will contribute to the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability.

    The project will address a number of market failures, including those associated with public goods, unaccounted for externalities and information failures, generating positive health and environmental benefits, which would not be realised to the same extent without public intervention. The project will also contribute to improving the efficiency of the potable water supply system while increasing its resilience against climate related risks. These benefits are not reflected in market prices and would not be realised to the same extent without public intervention.

    EIB intervention will allow the Borrower to lengthen the tenor of its debt and to contain the cost of funding, attracting other potential lenders.

    Ziele

    The project will contribute to meet the customer service standards set by the in-house agreement and the Key Performance Indicators set by the regulator ARERA. The related investments also aim at complying with all environmental requirements set by the national and EU legislation, notably the Drinking Water Directive 98/83/EC, the EU Urban Wastewater Treatment Directive 91/271/EC (UWWTD), as amended by 98/15/EC, and the Water Framework Directive (2000/60/EC).

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 150 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 300 million

    Umweltaspekte

    The investments are expected to have positive net environmental and social impacts, considering their focus on compliance with, amongst others, the Urban Waste Water Treatment Directive 91/271/EC and the Water Framework Directive 2000/60/EC, and their contributions to efficiency improvements. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the Directive 2011/92/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 30/03/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    23 Dezember 2022
    30 März 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Wasser, Abwasser