Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200587
    Veröffentlichungsdatum: 17 November 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    ORSZAGOS VIZUGYI FOIGAZGATOSAG

    Ort

    Beschreibung

    The Tisza Flood Plain project affects 62.21 km of embankments on the right bank and 53.25 km on the left bank of the Tisza river and involves a combination of measures of reconstruction of embankments of nature protections, improvements to summer and natural levees as well as river training interventions and improvements of flow within the flood conveyance zone.

    Ziele

    The project contributes to reducing the 1 in 100 year flood event of the Tisza river by between 40 cm and 50 cm and provides improved protection against floods to an estimated 125 000 inhabitants.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 8 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 60 million

    Umweltaspekte

    Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EC, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website. The Bank will assess the Promoter's capacity and procedures to ensure compliance with national and European environmental and biodiversity regulations.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU where applicable, and/or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    In Prüfung - 25/10/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Ungarn Wasser, Abwasser