Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200090
    Veröffentlichungsdatum: 25 August 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    STADTENTWAESSERUNGSBETRIEBE KOELN AOER

    Ort

    Beschreibung

    Investments regarding the wastewater disposal and treatment facilities of the City of Cologne (2021-2025).

    Ziele

    The project targets at improving the efficiency and sustainability of Cologne's wastewater services through rehabilitation and upgrading of combined sewer systems (conveying both wastewater and storm water), in line with the Promoter's "Abwasserbeseitigungskonzept 2020" (ABK), as well as the modernisation of wastewater treatment plants.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 150 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 350 million

    Umweltaspekte

    The project aims at maintaining compliance with the Urban Wastewater Treatment Directive 91/271/EC and Water Framework Directive 2000/60/EC. Several of the construction schemes included in the project might fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. Environmental impact assessment procedures are carried out, where required, by the competent authorities and mitigating measures are applied as appropriate. Where appropriate, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) are applied. The Bank's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 2/12/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Deutschland Wasser, Abwasser