    Referenz: 20190697
    Veröffentlichungsdatum: 21 April 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTERO DELLA DIFESA

    Ort

    Beschreibung

    The project concerns the construction of three vessels (one large vessel and two smaller vessels) tasked with hydrographic dual-use research activities for the Italian Navy Hydrographic Office (Istituto Idrografico della Marina, IIM) in Genoa, Italy. EIB financing will support eligible costs occurred during the construction in the period 2021-2027. The large vessel (NIOM) will perform hydrographic activities in oceans and is meant to operate widely, including in the Arctic. The two smaller vessels (NIOC1 and NIOC2) will operate in the Mediterranean Sea and adjacent ones.

    Ziele

    Through the renewal of the hydrographic fleet, the project will allow hosting more researchers as well as allow for state of the art hydrographic data collection and analysis. Additionally, it will contribute to increase the promoter's expertise and capacity in hydrographic monitoring and climate and maritime related research and to accelerate the accumulation and diffusion of knowledge in Europe, through the promoter's active collaboration with universities and research centres. The project will favour and enhance R&D in areas critical for climate and environment protection.

    Kommentar(e)

    n/a

    Sektor(en)

    • Dienstleistungen - Erbringung von Freiberuflichen, Wissenschaftlichen und Technischen Dienstleistungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 220 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 444 million

    Umweltaspekte

    The construction of seagoing vessels does not require an Environmental Impact Assessment (EIA) under Annex II of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU. All potential environmental issues will be assessed during the project's appraisal, including the measures to be taken in relation to the replaced vessels.

    Auftragsvergabe

    The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, (Directive 2014/24/EU as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 30/07/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Dienstleistungen