Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190156
    Veröffentlichungsdatum: 20 Mai 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    IREN SPA

    Ort

    Beschreibung

    The project consists of the financing of the promoter's 2018-2022 climate action and circular investments in the solid waste and hydro-electric sectors.

    Ziele

    The operation is structured as a programme of investments. The waste sector investments will be carried out in the main service area in the Liguria, Piedmont and Reggio Emilia regions, while the hydroelectric investments focus on 16 sites located in four different areas/valleys (3 in Piedmont, 1 in Campania). The project comprises the following waste sector investments: i) Two anaerobic digestion plants for bio-waste with a total capacity of 175 000 t/yr, ii) one waste wood to pallets production plant with a capacity to process about 110,000 tonnes per year of waste wood and iii) the purchase of new electric waste collection and other vehicles. The hydro-electric investments comprise about 16 plants in four rivers with i) the rehabilitation of existing hydro power plants, ii) the increase of operational efficiency, safety and reliability of existing units and iii) the construction of 3 new mini-hydro power plants.

    Kommentar(e)

    n/a

    Sektor(en)

    • Energie - Energieversorgung
    • Müllbeseitigung - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 120 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 210 million

    Umweltaspekte

    The three waste facilities are expected to fall under Annex 2 of the Environmental Impact Assessment (EIA) directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), and EIAs are required for the two digestion plants while the screening decision has not yet been received for the waste wood to pallets plant. None of the hydro-electric components are expected to require EIA. Compliance with the Habitats directive (92/43/EEC), Birds Directive (79/409/EEC), the Industrial Emissions Directive 2010/75/EU, and the Water Framework Directive (WFD) 2000/60/EC may also be required, where relevant. This will be verified during the appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 29/07/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie Müllbeseitigung