    Referenz: 20180836
    Veröffentlichungsdatum: 12 Mai 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    JSC FOR PERFORMING ENERGY ACTIVITIES NATIONAL ENERGY RESOURCES SKOPJE IN STATE OWNERSHIP

    Ort

    Beschreibung

    The project concerns the construction in North Macedonia of a gas interconnection with Greece, identified as a Project of Mutual Interest by the Energy Community. The Greece side is covered by the project "GAS INTERCONNECTOR GREECE-NORTH MACEDONIA GRPART 2019-0190".

    Ziele

    The main objective of the project is to enable security of gas supply for North Macedonia, through a diversification of gas sources and access routes. The project will also pave the way for further integration of the national gas market and infrastructure within both the Western Balkans region and the EU.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the ELM Guarantee.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 41 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 58 million

    Umweltaspekte

    It is required the project compliance with the national Environmental Impact Assessment (EIA) legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations concerning the protection of habitats, respective EU Directives (92/43/EEC and 79/409/EEC) are considered to be transposed, subject to verification during the appraisal. A social assessment will also be undertaken as part of the appraisal.

    Auftragsvergabe

    The promoter has to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    Genehmigt - 22/07/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Nordmazedonien Energie