Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20180290
    Veröffentlichungsdatum: 15 Januar 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    EDP RENOVAVEIS SA

    Ort

    Beschreibung

    The project concerns the construction and operation of three wind farms located in Portugal with a total capacity of 96 MW.

    Ziele

    The project will support EU and national targets for renewable energy generation, and contributes to the security of energy supply and environmental objectives. The project will further contribute the EIB's lending priority policy on social cohesion, renewable energy and climate action.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 47 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 96 million

    Umweltaspekte

    Windfarms falls under Annex II of Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the Member States shall determine whether the project shall be made subject to an assessment based on defined criteria. According to national legislation, windfarms exceeding certain criteria are subject to a mandatory Environmental Impact Assessment (EIA). This was the case for two of the three windfarms. The environmental studies for the EIA process were undertaken and the competent authorities have granted approval containing requirements to mitigate environmental impacts accordingly. Residual impacts were classified of small magnitude and low significance.

    Auftragsvergabe

    The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures applied. Equipment and works were purchased through multi contracts such as one for supply and installation of turbines, others for infrastructure works (Balance of Plant), electrical works etc.

    Projektstatus

    Unterzeichnet - 27/11/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Portugal Energie