Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20170825
    Veröffentlichungsdatum: 4 April 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    UNIWERSYTET MEDYCZNY IM KAROLA MARCINKOWSKIEGO W POZNANIU

    Ort

    Beschreibung

    The project involves the design, construction and equipment of a new state-of-the-art medical simulations centre at the Poznan Medical University. The project also includes the construction of the new building for the Faculty of Pharmacy and extension and rehabilitation of two university hospitals.

    Ziele

    The project aims to increase the educational, scientific and clinical potential of the Medical University in Poznan (UMP) by the design, construction and equipment of i) the Medical Simulations Centre, ii) the new seat of the Faculty of Pharmacy, iii) the extension and modernisation of the Heliodor Swiecicki University Hospital (emergency ward) and the Przemienienie Panskie Hospital (ophthalmic ward). Both hospitals are fully owned by the Medical University in Poznan and both are part of the Hospital Network. The project will help to modernise the curricula for undergraduate medical, pharmacy and health sciences students using top notch simulations' technology. The Medical Simulations Centre will also host, besides simulations units, departments of medical informatics, biostatistics and medicine of catastrophes. The new building of the faculty of pharmacy will host scientific laboratories of the Centre of Innovative Pharmaceutical Technologies as well as didactic premises. The construction of the new premises will add to intensification of scientific activities at UMP. The project is located in Poznan, Wielkopolskie voievodship, which is a convergence area.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 115 million (EUR 27 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 234 million (EUR 55 million)

    Umweltaspekte

    The project comprises the construction of academic buildings and medical facilities. These types of projects are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU, though the project is covered by Annex II of the Directive in relation to urban development. The Bank's services will verify during the appraisal the screening decision of the Competent Authority. In line with Directive 2010/31/EU, public buildings will have to meet at least the relevant national targets on energy efficiency. The design energy performance of the hospital and any specific related targets to be met will be verified during the appraisal. It is expected that the project will bring wider benefits to the community as medical training and healthcare are elements of social cohesion and economic development.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 28/06/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Gesundheit Bildung