    22 Oktober 2022
    Projektstatus
    Referenz
    Genehmigt | 17/11/2022
    20170694
    Projekttitel
    Projektträger – Finanzintermediär
    CAIRO METRO LINE 2 UPGRADING AND RENOVATION
    NATIONAL AUTHORITY FOR TUNNELS
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 240 million
    EUR 614 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project consists of the rehabilitation of the existing metro line 2 of the Cairo metro network. The rehabilitation includes the renewal of the signalling system, power supply and parts of the tracks. Allocation under Framework Loan (FL) 2020-0144.

    The project is expected to deliver significant time savings to existing users of metro line 2 and to provide additional capacity to accommodate an increasing demand that would otherwise be absorbed by less environmentally friendly modes of transport. The upgrade of the metro line will improve the reliability of the existing metro service and further reduce headways during peak hours. It will represent a fast and affordable transport solution to the population, in particular to those who cannot afford owning a private car. Furthermore, the project will result in vehicle operating cost savings, lower air emissions and less accidents stemming from the expected modal shift from road to public transport.

    Zusätzlichkeit und Wirkung

    The project is the rehabilitation of Cairo metro Line 2 to ensure continue reliable and safe metro operations and add much needed extra transport capacity. The project will improve the role of public transport in Cairo and promote sustainable mobility for its citizens. By supporting the shift of traffic from fossil fuelled private cars to collective and electric transport, the project will reduce negative externalities of road traffic (noise and air pollution, greenhouse gas emissions, road accidents and congestion), improving travel times and costs. In addition, the project contributes to more egalitarian access to jobs and study opportunities.


    The project shares the development priorities of Neighbourhood, Development and International Cooperation Instrument (NDICI), Global Challenges' Thematic Programme Priority Area 2 on sustainable mobility. The project also contributes to Team Europe Flagship 5 on Connected Economies, to a wide range of Sustainable Development Goals (SDGs) and to the Investment Plan of the Egyptian Ministry of Transport.


    The proposed operation has benefitted from substantial EIB advice and expertise and from a technical assistance (TA) funded by the EIB under the ERI TA envelope. EIB participation was key to the preparation of the feasibility study, and will remain important in terms of filling a funding gap and allowing the project to go forward according to the originally foreseen timetable. The project benefits from EIB's advantageous funding terms as it provides long tenor and affordable pricing.

    Umweltaspekte
    Auftragsvergabe

    If the project was located within the EU, it could fall under Annex II of the EIA Directive 2011/92/EC, thus requiring a decision by the competent authority to determine whether a full environmental impact assessment (EIA) has to be carried out. The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

    The Bank will require the promoter to ensure that any procurement process is consistent with the Bank's procurement guidelines

    Garantie im Rahmen des Außenmandats
    Kommentar(e)

    This operation is covered by the ELM Guarantee.

    The Project is part of the Urban Transport Infrastructure Framework, the aim of which is to finance large public transport projects in the cities of Alexandria and Cairo in Egypt over the next 5 years.

    Phase
    Genehmigt
    17 November 2022
    Projekte zum thema

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - CAIRO METRO LINE 2 UPGRADING AND RENOVATION
    Datum der Veröffentlichung
    13 Dec 2022
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    156584706
    Thema
    Umweltinformationen
    Projektnummer
    20170694
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen