Veröffentlichungsdatum: 3 Dezember 2018
Projektträger – zwischengeschaltetes Finanzinstitut
JP SRBIJAGAS NOVI SADOrt
Beschreibung
The project consists of the construction of the Serbian section of a gas interconnector between Serbia and Bulgaria to allow for the transfer of between 1 and 1.8 billion cubic metres of natural gas annually from Bulgaria to Serbia and 0.15 billion cubic meters from Serbia to Bulgaria. The project will contribute to diversification of supply routes and potential supply sources of natural gas to South-East European region.
Ziele
The project aims to provide diversification of gas supply routes and sources to the Serbian and South East Europe gas market and to improve market integration and security of supply to both Serbia and Bulgaria.
Sektor(en)
- Energie - Energieversorgung
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 25 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 86 million
Umweltaspekte
The Bulgaria-Serbia gas interconnector project is part of the "Energy Sector Development Strategy of the Republic of Serbia", which went through a Strategic Environmental Assessment process. At the feasibility stage an international consultant performed an Environmental and Social Impact Assessment (ESIA) of the project. The environmental permitting process is still ongoing with plans to be completed by the end of 2018. The pipeline route is proposed outside populated areas and in a way to avoid environmentally sensitive areas to the extent possible. It passes through largely agricultural land and forested areas. Impacts that can be typically expected are mainly temporary and relate to construction works. These impacts can usually be well managed by appropriate measures taken by the construction company in order to avoid unacceptable nuisance to other parties and the public. An assessment of the environmental procedures and capabilities of the Promoter, the potential environmental and social impacts of the Project along with checking alignment with the relevant EU Directives will be carried out during the appraisal.
Auftragsvergabe
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Projektstatus
Unterzeichnet - 20/05/2021
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).