Veröffentlichungsdatum: 14 Juli 2017
Projektträger – zwischengeschaltetes Finanzinstitut
National Power Company UkrenergoOrt
Beschreibung
A project to refurbish the existing electrical substations in Ukraine in order to increase energy efficiency, through shifting the substations in remote control mode and replacing energy-intensive equipment.
Ziele
The main purpose of the project is to increase the reliability of electricity transmission, improve the efficiency of the operation of the transmission network and reduce the operational and maintenance costs of the substations of the Transmission System Operator. All this will help improve electricity supply for consumers. Additionally, the automatisation of control processes at the substations will facilitate the parallel and synchronous operation of Ukraine's electricity system with the European Network of Transmission System Operators (ENTSO-E).
Sektor(en)
- Energie - Energieversorgung
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 136 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 136 million
Umweltaspekte
Environmental and Social due diligence, in form and substance satisfactory to the Bank, will have to be carried out in parallel with the feasibility studies.
Auftragsvergabe
The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Projektstatus
Unterzeichnet - 24/05/2018