INDEPENDENT POWER TRANSMISSION OPERATOR SAOrt
Beschreibung
The proposed project concerns the interconnection of the island of Crete with mainland Greece, in the region of Peloponnese. The project includes two AC 150 kV submarine cables, 150 kV underground and overhead circuits, a compensation terminal in the Peloponnese and network reinforcements associated to the interconnection. The landing points of the submarine cables are in Kissamos bay (Crete) and the Malea peninsula (Peloponnese).
Ziele
The project will (a) enable the replacement of thermal generation on the island (mainly oil-fired generation units) with more efficient generation from mainland Greece and (b) increase the hosting capacity of the island for renewable energy sources.
Sektor(en)
- Energie - Energieversorgung
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 178 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 356 million
Umweltaspekte
Some of the investments fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage. The potential impacts of the project include visual impact, vegetation clearance, electromagnetic fields, noise nuisance, birds' collision and mortality, disturbance and damage of marine flora and fauna. Environmental impact studies will be carried out as applicable and mitigating and/or compensation measures will be applied as necessary.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.
Projektstatus
Unterzeichnet - 9/05/2019
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).