    Referenz: 20160982
    Veröffentlichungsdatum: 21 September 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    AKUO ENERGY SAS

    Ort

    Beschreibung

    Multi-component investment programme articulated into sub-projects of construction and operation of several small-scale, mature renewable energy (RE) technologies such as wind farms, photovoltaic (PV) plants, hydropower plants and biomass throughout France and in other EU countries, for a total capacity of ~230 MW.

    Ziele

    The project would support national and EU renewable energy objectives and its commitments with respect to greenhouse gas emission reductions.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 165 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 330 million

    Umweltaspekte

    The sub-projects will be located within the EU and will most likely fall under Annex II of the EIA Directive (2014/52/EU), requiring the competent authorities to determine whether an environmental impact assessment (EIA) is required. As positive externalities, the project would reduce CO2 emissions.

    Auftragsvergabe

    The relevant procurement policies the promoter might be subject to were assessed as part of a previous operation the Bank has with the promoter. The conclusion drawn at the time of the analysis is still valid; the promoter is not subject to public procurement as it is neither a public undertaking nor does it enjoy special or exclusive rights in the sense of the relevant EU Procurement Directives. Thus the project is not subject to public procurement.

    Projektstatus

    Unterzeichnet - 21/02/2019

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags