    Projektträger – zwischengeschaltetes Finanzinstitut

    ALPERIA SPA

    Ort

    Beschreibung

    Investments in Alperia's hydroelectric power plants located in the province of Bolzano in the north-east of Italy

    Ziele

    To maintain or improve the reliability and safety of existing renewable energy facilities and to increase electricity production through improvements in plant and equipment efficiency

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 80 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 162 million

    Umweltaspekte

    The project includes some facilities that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent authority to determine the need for an EIA. As the plants already exist and have been operating for some time, the main impact that can be expected relates to noise nuisance and other disturbance during construction. According to the promoter, an environmental study could be required for the plant where the dam height will be increased to improve flood management. For the asbestos removal a special permit is required. The appraisal will focus on these aspects and on the promoter's environmental capacity and work procedures.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of ender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 6/12/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie