    Referenz: 20160393
    Veröffentlichungsdatum: 13 Juni 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTRY OF INFRASTRUCTURE AND CONSTRUCTION/GDDKIA

    Ort

    Beschreibung

    The project consists of the construction of an approximately 17km long 2x2 lane expressway in a mountainous area in southern Poland on a new alignment, including a 2 km tunnel. The section is part of the S7 linking the city of Krakow to the Slovak border.

    Ziele

    The project concerns the construction of an approximately 17 km long 2 x 2 lane expressway along the new alignment in southern voivodship of Poland – Malopolskie. It is part of the S7 road crossing Poland in the north-south direction, from Gdansk through Warsaw and further south to Krakow and Slovakia. The project addresses a section south of Krakow, between Lubien and Rabka, and will facilitate the passage of long-distance cross-border as well as regional traffic between Krakow region and Warsaw and will improve traffic conditions on a congested section between Krakow and Zakopane (the main Polish mountain resort) and Slovakia. The project includes construction of 2 km of road tunnel as well as approximately 5 km of viaducts and bridges, 2 interchanges and 3 service areas. The project will complement the investments made so far on the southern section of S7 expressway.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 470 million

    Umweltaspekte

    The project involves expressway road construction largely in a rural mountainous area. The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. A positive environmental decision was issued in 2010 and then amended in 2013 and 2014 after a supplementary EIA procedure. The project doesn't cross any Natura 2000 territory, but several sites (PLH12009 Raba z Mszanka; PLH120043 Lubon Wielki; PLH120018 Ostoja Gorczanska and PLB120001 Gorce) are located nearby at a distance of between 2.5 and 8 km. Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investments are included in the national road construction programme and the current operational programme for infrastructure and environment, both of which were subject to a form of strategic environmental assessment.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required. The main works tenders in 3 lots were issued on 24 December 2014 (OJEU 2014/S 248 – 437659; 437569 and 437631). The tender for supervision was issued on 7 August 2015 (OJEU 2015/S 151 – 278740).

    Projektstatus

    Unterzeichnet - 24/01/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr