    Referenz: 20160345
    Veröffentlichungsdatum: 24 Oktober 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    TERNA - RETE ELETTRICA NAZIONALE SPA

    Ort

    Beschreibung

    The proposed project is a multi-component investment programme. The main sub-project concerns the adjustment and renovation of 350 electrical substations recently acquired from the national railway company (RFI). Other sub-projects involve the construction of new substations and the associated connections and the installation of reactive power compensation equipment. The sub-projects of the programme are geographically dispersed throughout Italy.

    Ziele

    The main purpose of the main sub-project is to enable Terna to take over the operation of the former RFI substations. The main purpose of the other sub-projects is to integrate renewable generation into the grid and to improve quality and reliability of supply.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 401 million

    Umweltaspekte

    Some sub-projects of the programme fall under Annex II of the Environmental Impact Assessment (EIA) Directive. The potential impact of the programme includes visual impact, vegetation clearance, electromagnetic fields, noise nuisance and birds' collision and mortality. Environmental impact studies have been carried out as applicable and mitigating and/or compensation measures will be applied as necessary.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the programme have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2014/25/EC) as interpreted by the Court of Justice of the EU and according to the relevant Italian legislation (D.lgs. 163/2006 and D.lgs. 50/2016).

    Projektstatus

    Unterzeichnet - 8/12/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Energie