Veröffentlichungsdatum: 18 Januar 2017
Projektträger – zwischengeschaltetes Finanzinstitut
PRIVATE ENTITY(IES)Ort
Beschreibung
The project will finance the construction of an eco-campus in Fez, with research facilities and equipment, teaching facilities, a student residency and sport facilities.
Ziele
This new institution is co-developed with several European academic partners in order to offer training up to European standards, degrees certified for the European market, conduct high quality research and create cultural and economic bridges between the two shores of the Mediterranean Sea.
Sektor(en)
- Dienstleistungen - Erbringung von Freiberuflichen, Wissenschaftlichen und Technischen Dienstleistungen
- Bildung - Erziehung und Unterricht
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 84 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 147 million
Umweltaspekte
A project with similar characteristics within the EU would be classified under Annex II of Directive 2011/92/EU as amended by Directive 2014/52/EU, thus requiring a decision by the competent authority as to whether or not a formal environmental impact assessment (EIA) process is required. In an EU member state, universities specifically mentioned in the EIA Directive would not normally require an EIA. However, the projects could be covered by Annex II of the directive in relation to urban development and thus be subject to an EIA. The need for environmental studies and assessment has been reviewed during the appraisal process. The promoter has provided the EIB with the non-technical summary of the EIA carried out at building permit stage.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 7/07/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).