    Referenz: 20150820
    Veröffentlichungsdatum: 26 Oktober 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    Privately owned electricity distribution network operator

    Ort

    Beschreibung

    Investment schemes in the electricity distribution network covering various parts of Sweden, planned for implementation in the years 2017-2019

    Ziele

    The investments focus mainly on increasing the capacity and renewing the network in one of the larger cities, continuing to weather-proof the rural network and preparing the network to receive more distributed renewable energy.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Not disclosed.

    Gesamtkosten (voraussichtlicher Betrag)

    Not disclosed.

    Umweltaspekte

    The project includes some facilities that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent national authority to determine the need for an EIA. The impact that can typically be expected for some schemes relates to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction. However, medium voltage (MV) and low voltage (LV) schemes are normally expected to have minimal or no environmental impact. The appraisal will focus on the promoter's environmental management capacity and work procedures.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 7/02/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).