Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150676
    Veröffentlichungsdatum: 23 März 2016

    Projektträger – zwischengeschaltetes Finanzinstitut

    TANAP DOGALGAZ ILETIM AS

    Ort

    Beschreibung

    Construction of a gas pipeline through Turkey for transportation of natural gas from Shah Deniz production field in Azerbaijan to European and Turkish markets.

    Ziele

    Constructing and operating gas infrastructure and transmission in conformity with the priorities of the EU Energy Security Strategy, the TANAP project will play a key role in diversifying the supply of natural gas to European markets and in meeting natural gas demand in Turkey.

    Kommentar(e)

    It is anticipated that the borrowers of the operation will be BOTAS BORU HATLARI ILE PETROL TASIMA AS and SOUTHERN GAS CORRIDOR CJSC.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the ELM Guarantee.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 270 million (EUR 219 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 6960 million (EUR 5639 million)

    Umweltaspekte

    The promoter has carried out an environmental and social impact assessment (ESIA) including a land acquisition and compensation plan according to national and international standards. The project's environmental permit has been issued and construction has already started. The expected impact should be well managed through appropriate construction practices. The detailed assessment of all the environmental and social documentation will be conducted by the Bank during its appraisal process for this project.

    Auftragsvergabe

    TANAP is an entity owned 88% by publicly owned/controlled shareholders in Turkey (30%) and Azerbaijan (58%) established to build and operate a gas transmission pipeline from the Turkey-Georgia border to the Turkey-Greece border. As the promoter has been granted special or exclusive rights and operates in a non-liberalised market, procurement under the project to be financed by the Bank is considered as a public sector operation as defined in the Bank's Guide to Procurement. The promoter is required to ensure that it has conducted its procurement in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 20/12/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Türkei Energie