Veröffentlichungsdatum: 11 Mai 2015
Projektträger – zwischengeschaltetes Finanzinstitut
Nemzeti Infrastruktúra Fejleszto Zrt (NIF – National Infrastructure Development Company)Ort
Beschreibung
The project is a major project allocation under a Regional Accessibility Co-Financing Framework Loan and consists of the rehabilitation and new construction of approximately 39 km of Road 62 (2x1 lanes) between Székesfehérvár and Dunaújváros (M8 new Danube bridge) in Hungary.
Ziele
Road 62 plays an important role in the connectivity between the eastern and western parts of Hungary, connecting the M8 motorway bridge south of Dunaújváros. The road rehabilitation, including pavement strengthening and bypass construction, will reduce journey times and vehicle operating costs, and improve accessibility and traffic safety.
Kommentar(e)
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 19 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 71 million
Umweltaspekte
The project was included in recent strategies and programmes subject to the Strategic Environmental Assessment (SEA) Directive 2001/42/EC. The project is a class of development that falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. The construction of the Seregélyes bypass was subject to preliminary environmental assessment (EIA screening). The Environmental, Nature Conservation and Water Management Inspectorate (the Inspectorate) concluded that the project would not have a significant environmental impact. The cumulative impact was considered under an environmental performance evaluation; this was accepted by the Inspectorate in 2011.
Auftragsvergabe
The promoter is a public entity obliged to comply with European and national public procurement legislation. Works and service contracts were procured for the four project sections and lots. Five design service, four construction works and three supervision service contracts were published in the Official Journal of the European Union, in accordance with Directive 2004/18/EC, using open procedure, and were awarded on lowest price.
Projektstatus
Genehmigt - 12/06/2015
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).