Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140421
Veröffentlichungsdatum: 3 November 2014

Projektträger – zwischengeschaltetes Finanzinstitut

MIASTO STOLECZNE WARSZAWA

Ort

Beschreibung

Modernisation of 4,8 km of Voyvodship Road (NR 631) from Naddnieprzanska Street to the borders of the city (phase II)

Ziele

The road is a continuation of the Siekierkowska Route to the city border in the north-east. The section is characterised by high traffic levels and increasing congestion, causing a permanent increase in emissions and road accident risks. The reconstruction of the present road section is central to the overall transport plan for Warsaw as it connects the Siekierkowska Route to Warsaw's city ring road system and the TEN-T network.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

PLN 191 million (EUR 46 million)

Gesamtkosten (voraussichtlicher Betrag)

PLN 382 million (EUR 91 million)

Umweltaspekte

The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) and was screened-in for environmental impact assessment by the President of the Capital City of Warsaw (Decision 643/OS/2006). A complaint from Zielone Mazowsze was processed after the EIA was submitted. An environmental decision was subsequently issued and confirmed in 2012 (Decision 108/OS/2012). Compliance with the Habitats (92/43/EEC) and Birds Directives (79/409/EEC) will be assessed during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Genehmigt - 19/12/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr