    Referenz: 20140048
    Veröffentlichungsdatum: 14 April 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    SECRETARIA DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS

    Ort

    Beschreibung

    The project consists of the rehabilitation and upgrading of the road sections CA-11 La Entrada – El Florido and CA-4 La Entrada – Santa Rosa de Copán (in total 116 km). Both road sections form part of the Western Corridor of the primary national road network, connecting the second biggest city of the country – San Pedro Sula – to the international border crossings with Guatemala and El Salvador.

    Ziele

    The project contributes to the EU's global objective of improving social and economic infrastructure, including road transport, in Latin American countries.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 79 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 168 million

    Umweltaspekte

    The project involves rehabilitation and upgrading works on pre-existing roads, including some limited re-alignment. If the project was located within the EU, it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring screening to determine if EIA is required. A full EIA has been carried out. As part of the Bank's due diligence of the project, compliance with the relevant EU environmental and social principles, standards and practices will be verified. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 11/06/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).