    The purpose of the project is to construct new premises of the Faculty of Chemistry and Chemical Technology (FKKT) and the Faculty of Computer and Information Science (FRI) of the University of Ljubljana for about 2 650 students and 440 university staff.

    Ziele

    The investment programme provides space for dedicated buildings for each of the faculties and a common building. The total surface area will be around 30 000 m2. This investment falls within the EIB Structural Programme Loan supporting the implementation of the Slovenian National Strategic Reference Framework (Slovenia EU Funds 2007-2013).

    Kommentar(e)

    None.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 21 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 68 million

    Umweltaspekte

    Universities and research institutions are not specifically mentioned in the EIA Directive on Environmental Impact Assessment. An EIA is therefore not required in accordance with the EIA Directive 2011/92/EU. However, parts of the investment cover the construction of new facilities and therefore may be covered by Annex II of the Directive in relation to urban development. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 20/03/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Slowenien Bildung