    Referenz: 20130074
    Veröffentlichungsdatum: 17 Dezember 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    City of Krakow

    Ort

    Beschreibung

    Construction and reconstruction of the tramway infrastructure in Krakow

    Ziele

    The operation will improve the quality of public transport services in terms of speed, comfort, availability and reliability and will increase the attractiveness of public transport in both areas concerned (the new university campus and its surrounding commercial and residential areas and the stretch between the inner city and the residential area of Bienczyce/Nowa Huta). This improvement contributes to keeping public transport competitive compared to private cars, with associated positive benefits in terms of the environmental and economic sustainability of the city. The two projects are thus expected to improve the quality of the urban environment.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 133 million (EUR 31 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 307 million (EUR 72 million)

    Umweltaspekte

    Both schemes fall under Annex II of Directive 2011/92/EU, according to which the need for an EIA is decided on a case-by-case basis by the Competent Authority. The Tramway Network extension to the new Campus of the Jagiellonian University was screened in and an EIA was carried out in accordance with EU and Polish regulations. The Tramway network refurbishment was screened out based on the decision of the competent authority. Environmental aspects, including nature conservation, will be checked and further analysed during appraisal. The project will eventually have a positive overall effect on the quality of the urban environment and on society, as it will help reducing air and noise pollution. No main negative impact on the environment in general is expected to come from construction/operation, nor on Natura 2000 network.

    Auftragsvergabe

    The promoter is a public entity and is therefore subject to EU Public Procurement rules. The Bank will check that the Promoter ensures that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (in this case Dir 2004/18/EC, Dir 2004/17/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required. All contracts (design, supervision of works and civil works) have already been awarded. Tenders have been organised in compliance with EU requirements, with publication of tender notices in the EU Official Journal for all of them as they were above the relevant thresholds. Accordingly, procurement procedures are satisfactory to the Bank.

    Projektstatus

    Genehmigt - 28/02/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr