Veröffentlichungsdatum: 25 Juli 2012
Projektträger – zwischengeschaltetes Finanzinstitut
General Directorate for National Roads and Motorways.Ort
Beschreibung
Construction on a mostly new alignment of dual carriageway 2x2 lane expressway and associated roads in Poland, consisting of three sections along the S7 (total length of 90.5km) and four segments (total length of 300.98 km) of the S8 expressway corridors (TEN-T).
Ziele
Improving traffic flows on part of a Trans-European Network in a convergence region.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 900 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 3314 million
Umweltaspekte
A Strategic Environmental Assessment (SEA) has been done for this project, in accordance with the (SEA) Directive 2001/42/EC. Indeed, S7 and S8 corridors are included in the 20112015 National Road Construction Programme. The project falls under Annex I of the EIA Directive 2011/92/EU. In addition, the project also impacts areas covered under the Habitats (92/43/EC) and Birds Directive (2009/147/EC). During appraisal, the Bank shall review the environmental procedures.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation with publication of tender notices in the EU Official Journal, as and where appropriate. During appraisal, the Bank shall review the procedures.
Projektstatus
Unterzeichnet - 11/12/2012