Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20120184
    Veröffentlichungsdatum: 16 August 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    PJSC Myronivsky Hliboproduct

    Ort

    Beschreibung

    Construction of agri-food production facilities to build resilience to adverse weather events and crop yield variability. The project involves the construction of two grain-storage facilities, one fodder-processing plant and one sunflower-crushing plant.

    Ziele

    The project forms part of a major investment programme being implemented over several years to expand production capacity and improve resource efficiency and environmental sustainability. In addition, the project enhances food security, as it promotes the self-sufficiency of the host country in terms of locally processed feed and food ingredients and increased storage capacity, thus improving the resilience of the Ukrainian agri-food sector to adverse weather shocks, mainly droughts (climate change adaptation).

    Kommentar(e)

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 85 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 172 million

    Umweltaspekte

    Within the EU the project would, by virtue of its technical characteristics, fall within the scope of Annex II of Environmental Impact Assessment (EIA) Directive (2011/92/EU). An environmental impact study (EIS) was required under Ukrainian legislation. This was completed in 2010. Based on the EIS, the Ukrainian authorities granted the ecological permit in 2010 to the promoter, which is a condition for granting the construction permit. The project incorporates best available techniques for emissions abatement and air and water emissions are expected to be within the limits represented by international and European standards. The generated waste is neither significant nor of a dangerous nature and corresponding and appropriate disposal mechanisms have been already established.

    Auftragsvergabe

    The promoter will be required to comply with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 1/12/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ukraine Industrie