    Referenz: 20090484
    Veröffentlichungsdatum: 4 Februar 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    A group of private sector investors

    Ort

    Beschreibung

    Construction and operation of a 300 MW wind power plant near Lake Turkana, Kenya

    Ziele

    The Lake Turkana Wind Power Project involves the construction and operation of a 310 MW wind power plant. The wind farm design includes 365 turbines and ancillary infrastructure including a 33/200 kV substation. The project also includes approximately 200km rehabilitation of the existing road from Laisamis to the wind farm site. The project is located near Loiyangalani in Marsabit District, approximately 12 km east of Lake Turkana in northern Kenya in a sparsely populated desert area. In order to connect the wind farm to the grid, a 428 km long transmission line will be constructed to connect to the existing transmission infrastructure near Suswa. It is designed to allow for future development of geothermal resources and future onshore wind projects along its path. This project is being separately developed by the Kenyan transmission company KETRACO . The project will sell all its electrical output to the Kenya Power and Light Company Ltd. under a 20-year Power Purchase Agreement (PPA).

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 225 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 613 million

    Umweltaspekte

    If located within the EU, the wind farm would be classified by virtue of its technical characteristics as an Annex II project according to the Environmental Impact Assessment (EIA) Directive 85/337/EEC, as amended. Thus, the requirement to carry out an EIA would be up to the discretion of the competent authorities. The high voltage transmission lines would be classified as Annex I, which would require a mandatory EIA. For both the wind farm and the transmission line, an ESIA has been performed and will be further analysed by the Bank. The project's environmental and social assessment procedures, including public consultation and stakeholder participation, shall comply with the Bank's environmental and social principles and standards.

    Auftragsvergabe

    The project is considered a private sector operation not benefiting from special or exclusive rights. The procurement procedures are considered compliant with the EIB Guide to Procurement.

    Projektstatus

    Unterzeichnet - 21/03/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).