Veröffentlichungsdatum: 29 Januar 2008
Projektträger – zwischengeschaltetes Finanzinstitut
EnagasOrt
Beschreibung
The project comprises the promoter’s investment programme during 2007-2011 in the natural gas sector in Spain. It consists to a large extent of Energy-TEN projects of common interest, including priority TEN projects with regard to LNG import, gas transmission and underground storage. The programme components are dispersed throughout the country including the Balearic and Canary archipelagoes.
Ziele
The purpose is to meet growing gas demand and to improve the country’s security of supply through investments in new LNG re-gasification installations, gas transmission pipelines and underground storages.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to 50% of the project cost, with a maximum amount of EUR 1000 million.
Gesamtkosten (voraussichtlicher Betrag)
The cost of the programme is estimated by the promoter at EUR 3988 million.
Umweltaspekte
All programme components will need environmental assessments as required in the EIA Directive 85/337/EC and amendments of 1997 and 2003. By their technical characteristics all components do fall under Annex I or II of the directive.
Auftragsvergabe
Investments under the programme are subject to the procurement procedures as defined in Directive 2004/17/EC for entities operating in the water, energy, transport and postal services sector.
Projektstatus
Unterzeichnet - 19/12/2008
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).