Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070322
    Veröffentlichungsdatum: 18 März 2008

    Projektträger – zwischengeschaltetes Finanzinstitut

    Dong Energy A/S, headquartered in Fredericia.

    Ort

    Beschreibung

    The project will consist of the construction of the Horns Rev II off-shore wind farm (up to 210 MWe), located in the North Sea, off the south west coast of Denmark, next to the existing Horns Rev off-shore wind farm.

    Ziele

    The development of renewable energy capacity, using an indigenous source of energy, will support European and national targets for renewable energy generation and contribute to diversification of energy supply. Electricity generation from wind will displace fossil fuel-fired generation and thus avoid the associated emissions of CO2, NOx, and SO2. The project is therefore in line with the Bank's priority objectives of supporting renewable energy and the rational use of energy.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 260 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Indicatively estimated at DKK 4140 million. (EUR 555 million)

    Umweltaspekte

    By virtue of their technical characteristics, the projects fall under Annex II of Directive 85/337/EEC with regard to Environmental Impact Assessment (EIA). The Bank will review the details of the environmental procedures followed for all sub-schemes of the project, including the results of potential EIAs, mitigating measures to be applied, and any effects on nature conservation sites (“Habitats” Directive 92/43/EEC and the Natura 2000 network).

    Auftragsvergabe

    Preliminary information provided to the Bank shows that the project is being implemented under a number of separate contracts. Publications in the EUOJ indicate that procurement procedures applied follow the provisions of relevant national and EU procurement legislation.

     

    Projektstatus

    Unterzeichnet - 16/06/2008

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Dänemark Energie