Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060299
    Veröffentlichungsdatum: 21 August 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Greater Manchester Waste Disposal Authority (GMWDA), one of seven statutory waste disposal authorities created under the Local Government Act 1985 to carry out the waste management functions and duties of the Metropolitan County Councils after their abolition in 1986. GMWDA serves approximately 958 000 households with a population of 2.23 million.

    Ort

    Beschreibung

    Design, construction, operation and maintenance of an integrated waste management service for the treatment and disposal of municipal waste in Greater Manchester, an Objective 2 area in North West England.

    Ziele

    The project aims to assist the regional waste disposal authority in gradually achieving its targets of 50% recycling/composting and 65% diversion from landfill by 2020 in accordance with new national requirements and EU waste policy.

    Kommentar(e)

    Environment.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 50% of senior debt

    Umweltaspekte

    The project will have environmental benefits, increasing levels of recycling and reducing the amount of waste sent to landfill. The project is in particular driven by the reduction targets for biodegradable waste going to landfills, as set out in Art 5.1 of the Landfill Directive (99/31/EC). These targets shall be achieved by means of recycling and composting. Thereby, the integrated waste management scheme will progressively reduce adverse effects on the environment, improve local amenity and reduce risks to public health. The waste management facilities included in the project fall by virtue of their technical characteristics under Annex II of Directive 85/337/EEC amended by 97/11/EC and 2003/35/EC.

    Auftragsvergabe

    As is standard for UK PFIs, the project has been procured in accordance with relevant EU Directives.

    Projektstatus

    Unterzeichnet - 8/04/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Müllbeseitigung