Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060129
    Veröffentlichungsdatum: 10 Juli 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Iberdrola Energías Renovables II SAU

    Ort

    Beschreibung

    Renewable energy (mainly wind power) investment programme involving a package of medium to large scale wind farms geographically dispersed all over in Spain (Objective 1 regions); comprising the installation of up to 30 wind farms with a combined capacity of around 900 MWe to be implemented over the 2006-2007 period.

    Ziele

    The project will generate renewable energy for supply to the public grid, and will thereby partly replace fossil fuel-fired power generation. This is in line with national and EU policy objectives and contributes to avoiding the release of CO2 and other environmentally damaging emissions to the atmosphere. The project will also increase the promoter’s share of power generation from renewable energy sources and shall consolidate its position within the Spanish market.

    Kommentar(e)

    Renewable Energy

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 75% of project cost under the Climate Change Financing Facility (CCFF).

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately up to EUR 970 million.

    Umweltaspekte

    By virtue of their technical characteristics, the wind farms fall under Annex II of Directive 97/11/EC amended 2003/35/EC. Thus, they would be subject to an EIA based on a case-by-case decision or defined criteria set by the competent authorities. The details of the environmental procedures followed by the promoter (if applicable), the results of EIAs and public consultation, and mitigating measures to be applied will be reviewed during appraisal. This will include the potential effect on nature conservation sites. The Bank’s finance contract will require the promoter to comply with all relevant EU legislation in the field of the environment.

    Auftragsvergabe

    The promoter operates a qualification system according to the Utilities Directive (93/38/EEC) for all of its procurement needs. Contracts for implementation of the wind farms will be tendered in accordance with the relevant EU procurement legislation, with publication of tender notices in the EU Official Journal (if appropriate) via a common, electronic register system used by most of the Iberian companies acting in the utilities sector.

    Projektstatus

    Unterzeichnet - 27/10/2006

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Spanien Energie