Veröffentlichungsdatum: 2 Februar 2006
Projektträger – zwischengeschaltetes Finanzinstitut
Telecom Italia SAOrt
Beschreibung
Extension of the promoter's high-speed network in France.
Ziele
Expansion and development of the range of services on the French high-speed market.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Around EUR 200 million (to be verified during the appraisal)
Gesamtkosten (voraussichtlicher Betrag)
Around EUR 600 million (to be verified during the appraisal)
Umweltaspekte
In line with the provisions of the EU Directive 1997/11/EC currently in force, an EIA is not required for the supply of telecommunications services (services of this kind are not covered by Annexes I and II). The project is not likely to cause significant environmental damage given that the schemes primarily involve work on existing local network or transmission facilities. The laying of cable ducts and the construction of new shelters could have a minor environmental impact.
Auftragsvergabe
The telecommunications sector, which is considered to be a competitive market, is excluded from the scope of the EU Directive on utilities contracts (Directive 2004/17/EC). The promoter should implement effective procurement procedures that will be checked as part of the appraisal.
Projektstatus
Unterzeichnet - 27/12/2006
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).