Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20030377
Veröffentlichungsdatum: 22 Oktober 2004

Projektträger – zwischengeschaltetes Finanzinstitut

Syndicat Mixte des Transports en Commun de l’Agglomération Grenobloise (SMTC Grenoble).

Ort

Beschreibung

The project consists of the construction of two new lines (C and C’) for Grenoble's tramway network along with the supply of the rolling stock and additional equipment required for their commissioning. The double-track line serving 22 new stations will be 11.7 km long and feature a new depot and various improvements to the urban environment.

Ziele

The project is the core component of the Urban Transport Plan adopted by SMTC Grenoble in May 2000, the objectives of which are to:

  • enhance the quality of urban life,
  • revitalise the region's economy,
  • improve links between districts while respecting sensitive areas,
  • encourage a switch from car use in the city to less polluting modes of transport.

Kommentar(e)

Urban transport.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 200m

Gesamtkosten (voraussichtlicher Betrag)

EUR 422.2m

Umweltaspekte

Overall, the project will have a positive environmental impact.

Auftragsvergabe

The project falls under European procurement directive 93/38/EC as amended by directive 98/4/EC. The promoter complies fully with the provisions of this directive.

Projektstatus

Unterzeichnet - 2/06/2005

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Verkehr