Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20020427
    Veröffentlichungsdatum: 19 Dezember 2002

    Projektträger – zwischengeschaltetes Finanzinstitut

    Water Utilities Corporation
    Luthuli Road
    Private Bag 00276
    Gaborone
    BOTSWANA
    e-mail : NMbayi@wuc.bw

    Ort

    Beschreibung

    The project consists of the immediate bulk water supply works identified by the Francistown Master Plan with the following main components: refurbishment and extension of bulk treated water supply facilities such as water treatment plants, pumping stations, storage and main pipelines.

    Ziele

    Against the background of current water supply facilities operating at capacity the project contributes to the (i) elimination of a constraint to the economic and industrial development of the area; (ii) continued provision of an adequate quantity of drinking water to the population in the Francistown area as well as (iii) health benefits of a high-quality surface water source.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    up to EUR 12.5 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 25 million

    Umweltaspekte

    The project constitutes the only solution for providing the population with a sufficient amount of good quality drinking water. The increased volume of waste water created by the project will be treated in the newly built biological waste water treatment plant. Environmental aspects have been considered in the pre-investment study of February 2002, scoping has been performed and recommendations for a detailed EIS have been made. The implementation of an acceptable EIS before project implementation will be a condition of first disbursement.

    Auftragsvergabe

    Procedures in line with the Bank's guidelines.

    Projektstatus

    Unterzeichnet - 14/02/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Botsuana Wasser, Abwasser