    Referenz: 20130105
    Veröffentlichungsdatum: 12 Januar 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    OMNICANE

    Ort

    Beschreibung

    Development of an ethanol plant for biofuel purposes with CO2 capture. The key objective of this operation is to add value through the further processing of molasses, itself a by-product of sugar cane processing.

    Ziele

    This project forms part of an adaptation strategy to improve the competitiveness of the local sugar industry by ensuring a fully integrated approach to producing sugar and all of its by-products, thereby fostering the country's economic and social development and contributing to sustainable long-term development. The project encompasses the optimal use of natural resources, production of renewable energy as well as carbon dioxide capture, which are fully in line with EU policies.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 8 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 23 million

    Umweltaspekte

    An existing distillation facility is to be re-located from a town-centre location to an established industrial site with an existing biomass CHP facility, with additional investments to capture CO2 generated by the process to replace imported gas. There will be an on-site waste-water treatment plant and the final by-product will be converted into fertiliser in an associated plant. The nature and scale of the investment are such that it is unlikely that an environmental impact assessment (EIA) would have been required if the plant had been located within the EU. The position in respect of national legislation will be confirmed at appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 6/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Mauritius Landwirtschaft, Fischerei, Forstwirtschaft