Signature(s)

Amount
€ 500,000,000
Countries
Sector(s)
Italy : € 500,000,000
Transport : € 500,000,000
Signature date(s)
16/12/2025 : € 500,000,000

Summary sheet

Release date
22 December 2025
Status
Reference
Signed | 16/12/2025
20250479
Project name
Promoter - financial intermediary
IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK II
AUTOSTRADE PER L'ITALIA SPA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 500 million
EUR 1264 million
Location
Sector(s)
Description
Objectives

Phase II of the modernisation of Italy's motorway infrastructure with upgrades to the 2,855 km network operated by ASPI. The project includes: i) regulatory static improvements to viaducts/bridges and tunnels with the aim to improve the resilience of the overall network to the negative effects of extreme climate events and ii) road safety improvement works and iii) measures to reduce noise and water pollution.

The project aims at modernising ASPI's motorways and ancillary infrastructure, mostly on the TEN-T. The main objectives are to safeguard and upgrade the assets by extending their useful life, to enhance its resilience, and to improve road safety.

Environmental aspects
Procurement

The project involves multiple components generally expected to be performed within existing rights of way; therefore, potential negative environmental impacts are likely to be minor and temporary during the construction phase. These include mainly impacts associated to potential contamination of surface and groundwater resources, air emissions, generation of noise and vibrations as well as impact on flora and fauna during construction works and during the operation phase. The schemes are likely fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU and therefore be subject to screening. Given the nature of the proposed works, it might be unlikely that any of the individual investments will require an EIA. This will be further verified during the implementation of the project. For each scheme, the EIB shall request the promoter to inform whether an EIA is required under the applicable national legislation and provide a clear explanation of how this determination has been made, supported by documentation from the competent authority where available. In addition, for each scheme, the EIB will request the promoter to inform whether these are likely to affect Natura 2000 sites and, if so, to provide the competent authority's authorisation in alignment with the requirements of Article 6(3) or Article 6(4) of the Habitats Directive. The project is expected to contribute to climate action and environmental sustainability objectives, in particular to climate adaptation, pollution prevention and control.

ASPI is a privately owned company, belonging to the category of concessionaires which are not contracting authorities. Consequently, the promoter has therefore been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. Nevertheless, certain components of the project may fall under national public procurement requirements. This does not represent an issue, as ASPI generally operates in compliance with Article 186 of the Public Procurement Code, which stipulates that motorway concessionaires must award between 50% and 60% of contracts instrumental to the operation of the concession through public tender procedures, while retaining full discretion for the remaining share. A portion of the investments included in the project has been, or will be, directly awarded to the promoter's subsidiary companies. However, given the above, this practice is fully consistent with Article 186 of the Public Procurement Code.

Milestone
Under appraisal
Approved
Signed
9 December 2025
16 December 2025

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK II
Publication Date
23 Dec 2025
Document language
Main Topic
Lending
Document Number
252335437
Document Focus
Environmental Information
Project Number
20250479
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications