Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Übersicht

    Veröffentlichungsdatum
    25 Oktober 2022
    Projektstatus
    Referenz
    Genehmigt | 28/09/2022
    20220596
    Projekttitel
    Projektträger – Finanzintermediär
    KEOLIS - PACA ELECTRIC BUS FLEET
    SOCIETE GENERALE
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 31 million
    EUR 62 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project includes: (i) the acquisition of 112 full-electric vehicles (96 buses and 16 double-decker coaches) to replace end-of-life diesel buses fleet and provide interurban public bus transport services in the French region Sud Provence Alpes Côte d'Azur and (ii) the construction of associated infrastructure needs, namely electric charging stations and depot adaptations. The later will not be financed under this allocation but are considered as associated facilities.

    The project supports the decarbonisation of the land transport fleets which is part of the actions foreseen under the regional climate mitigation and adaptation plan (plan Climat) and the Contrat de plan Etat-Région 2021-2027 strategic documents. It is also in line with the Clean Vehicle Directive ("CVD"), the EC Smart & Sustainable Mobility Strategy and the overall EU ambition to reduce transport related CO2 emissions developed in the 'fit for 55' package in line with the Paris Agreement.

    Zusätzlichkeit und Wirkung

    The investments foreseen will support the renewal of end-of-life public transport vehicles and the market take-up for the deployment of zero-emission vehicles and associated infrastructure.


    They will also contribute to improving the quality of public transport services providing a cleaner and more affordable alternative for urban and inter-urban mobility needs (accessible transport), thus helping to reduce reliance on private cars, contributing to a reduction of noise, pollution and greenhouse gas emissions . 


    The project supports the decarbonisation of the land transport fleets which is part of the actions foreseen under the regional climate mitigation and adaptation plan (plan Climat) and the Contrat de plan Etat-Région 2021-2027 strategic documents. It is also in line with the Clean Vehicle Directive ("CVD"), the EC Smart & Sustainable Mobility Strategy and the overall EU ambition to reduce transport related CO2 emissions developed in the 'fit for 55' package in line with the Paris Agreement.


    The project therefore contributes to sustainable transport and climate change mitigation, in line with the new EIB's Transport Lending Policy and the provisions of Annex 4 of the EIB's Group Roadmap in its role of the Climate Bank. Moreover, as a transition region, the region Sud Provence Alpes Côte d'Azur qualifies as a Cohesion region. A certain proportion of the buses acquired through this project will run on the TEN-T Mediterranean corridor.


    The investments covered under this allocation are expected to deliver benefits in terms of lower operational and maintenance costs as well as environmental and social benefits (safety, reduced local pollution, noise and global warming).

    These investments are expected to contribute to the following objectives that address market

    failures, amongst others: (i) the reduction of the related negative road transport externalities, (ii) the generation of positive externalities through improved accessibility to services and employment by providing a cleaner, more efficient and affordable alternative for urban and inter-urban mobility needs and (iii) the improvement of the efficiency of the transport network and the optimisation of the use of public goods, thus bringing benefits in terms of time and cost savings, and less traffic congestion.


    Umweltaspekte
    Auftragsvergabe

    The acquisition of electric buses, depot adaptations as well as instalment of charging infrastructure do not fall within the scope of the Environmental Impact Assessment (EIA) Directive 2011/92/EC amended by Directive 2014/52/EU. Therefore, no EIA will be required for these components. Given the nature of the project components, no impacts on Natura 2000 or other protected sites are expected. In any case, during appraisal, the Bank's services will check the compliance with the requirements of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU. Additionally, and as applicable, the Bank's services will review compliance with the SEA Directive 2001/42/EC, the relevant Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively) and the Water Framework Directive (2000/60/EC).

    The final beneficiary, Keolis, was awarded a Public Service Contract (PSC), through a competitive public procurement procedure in line with Regulation 1370/2007 which was tendered in accordance with the relevant applicable EU procurement legislation. The final beneficiary is responsible for the tender processes of the investments to be financed under this allocation. It has been assessed by the EIB as being a private company and not being subject for these investments to EU rules on public procurement. It has chosen the manufacturer and contractors on the basis of the best quality/price balance whilst meeting the PSC's requirements.

    Phase
    Genehmigt
    28 September 2022
    Projekte zum thema

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdeverfahren

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

    Weitere Veröffentlichungen