The project entails the acquisition of 33 trainsets for regional rail transport, including 22 trains for services on the Amiens – Paris and St. Quentin-Paris line, and 11 trains for services between Picardie (Amiens, Creil, Compiègne, St. Quentin) and Roissy Charles de Gaulle Airport line.
The project should improve the quality and increase the offer of regional passenger rail services in the Region Hauts de France. The project will promote sustainable transport as it fosters modal shift from the road and therefore contributes to the reduction of CO2 emissions and pollution levels within the regional urban agglomerations, and will therefore contribute towards EIB's volume target commitment to climate action. The impact on modal share would also improve transport safety. The rolling stock is expected to be mostly used in transition regions. The project is therefore eligible for financing under Article 309 point (a) projects for developing less-developed regions and 309 point (c) common interest.
The project consists of the acquisition of electric trainsets for regional passenger services. It is expected to generate good economic and social benefits, improving safety, comfort and better access for persons with reduced mobility. The shift of passenger traffic to rail addresses market failures by reducing negative transport externalities, such the harm to humans in terms of accidents and loss of life, noise, pollution and CO2 emissions. The rolling stock will be equipped with the European Railway Traffic Management System, thus addressing a coordination failure.
The EIB's involvement in the financing of the project will lead to the improvement of the promoter's financial profile by diversifying its funding base, increasing its debt maturity structure and lowering its average cost of funding.
The resulting rating is "excellent".
The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, as manufacturing and use of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) as well as the arrangements for the scrapping of the replaced rolling stock will be analysed during the appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain and increase modal share in key sections of the passenger market that are most appropriately met by rail.
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation: Directive 2004/17/EC, applicable at the time of procurement, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required. The rolling stock is being procured under an existing framework contract, valid until July 2025, for which the contract and award notices were published in the OJEU (2008/S 134-180288; 2010/S 59-087369).
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).
Dokumente
Allgemeine Fragen und Anmerkungen
Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.
Medienanfragen
Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.
Beschwerdemechanismus
Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.
„Null Toleranz“ gegenüber Betrug und Korruption
Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.
Weitere Veröffentlichungen