    Summary sheet

    Release date
    26 February 2016
    Status
    Reference
    Approved | 02/05/2016
    20150333
    Project name
    Promoter - financial intermediary
    SOFIA RING WESTERN ARC CONSTRUCTION (FL20060411)
    MINISTRY OF TRANSPORT AND COMMUNICATIONS
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 9 million
    EUR 46 million
    Location
    Sector(s)
    Description
    Objectives

    The Sofia Ring Western Arc Construction project comprises the reconstruction of an existing urban motorway and an important portion of the Sofia Ring Road. The project has a total length of 8.537 km and includes 5 road interchanges, 1 bridge over a river, 1 road overpass, 2 railway overpasses, 3 roundabouts, 2 motorway viaducts (multi-span bridges), retaining walls and reinforced embankments as well as the reconstruction and relocation of several affected utility networks. The project is in line with the Sofia Municipality Development Plan and will connect major motorways, already financed by the EIB: the Lyulin Motorway and the Northern Speed Tangent, ultimately connecting to the Sofia-Kalotnia and Hemus motorways. The project is located on the Trans-European Transport Network (TEN-T), co-financed by the EU Cohesion Fund, and is implemented by the Road Infrastructure Agency.

    The new motorway will reduce congestion and traffic and improve urban mobility and safety. The project will increase traffic speeds and thus contribute to travel time and operating cost savings.

    Environmental aspects
    Procurement

    This project falls under Annex II of the Bulgarian Environmental Act as well as Environmental Impact Assessment (EIA) Directive 2011/92/EU Article 10 e. In line with the Ministry of Environment and Water (MoEW) Decision (No 34-PR/2010) dated 27/09/2010 there is no necessity to carry out an EIA. The nearest Natura 2000 protected sites are located some 7 km away from the proposed development. The competent authority concluded that the project is not likely to exert a negative impact on natural habitats, populations and habitats of species subject to conservation.

    The project has been procured by the Road Infrastructure Agency (RIA) and contracts have been awarded through international open tenders in accordance with Directive 2004/18/EC.

    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Completion Sheet (ESCS) - SOFIA RING WESTERN ARC CONSTRUCTION (FL20060411)
    Publication Date
    21 Jan 2020
    Document language
    Main Topic
    Lending
    Document Number
    124814535
    Document Focus
    Environmental Information
    Project Number
    20150333
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - SOFIA RING WESTERN ARC CONSTRUCTION (FL20060411)
    Publication Date
    10 Jan 2020
    Document language
    Main Topic
    Lending
    Document Number
    64064630
    Document Focus
    Environmental Information
    Project Number
    20150333
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications