Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140527
    Date de publication: 23 avril 2015

    Promoteur – Intermédiaire Financier

    AVINOR AS

    Lieu

    Description

    The project concerns the expansion and upgrade of Bergen-Flesland Airport (Bergen, BGO) in order to cater for future growth in traffic and to improve passenger service standards. The airport, which is the second busiest airport in Norway, is located 19km south of Bergen city centre, on the west Norwegian coast, and handled 6.2 million passengers in 2014.

    Objectifs

    The project will provide additional terminal infrastructure and will improve the level of service offered by the existing facilities which are operating above capacity and with many of the airport subsystems heavily congested during peak periods. It includes the construction of a new Terminal 3 and its associated airside and landside facilities, including a light rail station that will improve the public transport link between the airport and the city centre.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 427 million

    Aspects environnementaux

    A project of this type would normally be classified under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EC, meaning that the competent authority makes the decision as to whether a formal EIA is required or not. This, and the status of any pre-existing development consents, will be reviewed and assessed during project appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 21/10/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Norvège Transports