Référence: 20230860
Date de publication: 22 octobre 2024

Promoteur – Intermédiaire Financier

KONTROLA LETENJA SRBIJE I CRNE GORE SMATSA DOO BEOGRAD

Lieu

Description

The project will upgrade SMATSAs current air navigation control software to a state of the art air traffic control system. This upgrade will enable the promoter to maintain the highest operational and safety and security standards in air traffic control, consistent with the EUROCONTROL European ATM masterplan and the Single European Sky (SES) regulations. The project scope comprises the software and hardware upgrade of the TopSky system, including the network equipment for interconnecting all the components on SMATSAs main air traffic control center in Belgrade, as well as other company locations in Podgorica, Tivat, Batajnica, Kraljevo and Nis. Related services are also included in the project include: system design, software development, factory acceptance testing, installation, integration, training, site acceptance testing and support for operational transition.

Objectifs

The aim is to modernise the ATC infrastructure in Serbia and Montenegro in accordance with the Single European Sky (SES) regulations, a central element of European air transport policy. SES infrastructure is included in the priority Trans-European Transport Networks (TEN-T), making the project eligible for EIB financing as a Priority Project in Neighbouring countries - extended TEN-T.

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 35 million

Coût total (montant approximatif)

EUR 82 million

Aspects environnementaux

The project takes places in Serbia and Montenegro both non-EU countries. In Serbia, the project scope does not fall under Lists (Annexes) I or II of the Environmental Impact Assessment (EIA) law that lists the projects that mandatorily require (Annex I) or that may require (Annex II) an EIA. Similarly in Montenegro the project scope does not fall into the Lists (Annex) I or II of the EIA law, meaning that in both countries the Competent Authority does not make a decision as to whether a formal EIA is required. Were this project located within the EU, it would not fall under Annex I or Annex II of Directive 2011/92/EU amended by the Directive 2014/52/EU on the assessment of the effects of certain public and private projects on the environment (EIA Directive).

Passation des marchés

The promoter shall implement the project in accordance with the procurement rules and procedures of the European Bank for Reconstruction and Development (EBRD) and in compliance with the requirements and standards that have been agreed between EBRD and the EIB for projects under a Project Implementation Agreement as foreseen in the Bank's Guide to Procurement. In particular, the Bank will require that calls for international tenders will be published in the OJEU in accordance with the Bank's Guide to Procurement.

Statut

À l'examen - 7/02/2024

Milestone
À l'examen

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Serbie Monténégro Transports