Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    25 000 000 €
    Pays
    Secteur(s)
    Monténégro : 2 000 000 €
    Serbie : 23 000 000 €
    Transports : 25 000 000 €
    Date(s) de signature
    23/12/2024 : 2 000 000 €
    23/12/2024 : 23 000 000 €

    Fiche récapitulative

    Date de publication
    22 octobre 2024
    Statut
    Référence
    Signé | 23/12/2024
    20230860
    Nom du projet
    Promoteur – Intermédiaire financier
    AIR TRAFFIC CONTROL UPGRADE II
    KONTROLA LETENJA SRBIJE I CRNE GORE SMATSA DOO BEOGRAD
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 35 million
    EUR 82 million
    Lieu
    Secteur(s)
    Description
    Objectifs

    The project will upgrade SMATSAs current air navigation control software to a state of the art air traffic control system. This upgrade will enable the promoter to maintain the highest operational and safety and security standards in air traffic control, consistent with the EUROCONTROL European ATM masterplan and the Single European Sky (SES) regulations. The project scope comprises the software and hardware upgrade of the TopSky system, including the network equipment for interconnecting all the components on SMATSAs main air traffic control center in Belgrade, as well as other company locations in Podgorica, Tivat, Batajnica, Kraljevo and Nis. Related services are also included in the project include: system design, software development, factory acceptance testing, installation, integration, training, site acceptance testing and support for operational transition.

    The aim is to modernise the ATC infrastructure in Serbia and Montenegro in accordance with the Single European Sky (SES) regulations, a central element of European air transport policy. SES infrastructure is included in the priority Trans-European Transport Networks (TEN-T), making the project eligible for EIB financing as a Priority Project in Neighbouring countries - extended TEN-T.

    Additionnalité et impact

    The project aims to modernize air navigation systems in Serbia and Montenegro in line with SES regulations, a key part of European air transport policy. As part of the priority TEN-T network, it qualifies for Bank financing as a Priority Project in Neighbouring countries. This initiative is also part of the Economic and Investment Plan (flagship 8 - DIGITAL INFRASTRUCTURE) by the European Commission, which seeks to boost long-term economic recovery, support green and digital transitions, and foster regional integration with the EU.


    Aligned with the 2017 Transport Community Treaty between the EU and the Western Balkans, Serbia's signing of the European Common Aviation Area (ECAA) Agreement in December 2017 marks a significant step towards deeper integration into the European aviation area, enhancing growth, connectivity, and competitiveness.


    The project, co-financed with the EBRD, will improve air traffic management efficiency over Serbia and Montenegro, contributing to the Single European Sky initiative. This will lead to more direct aircraft routings, fewer delays, environmental cost savings, and safety improvements, with a high expected economic return, as well as high regulated financial return for the promoter.


    The EIB's significant financial contribution, including a 14-year tenor and favourable conditions, is crucial for the project's financing plan. The Bank's support in procurement and reporting will also raise standards.

    Aspects environnementaux
    Passation des marchés

    The project takes places in Serbia and Montenegro both non-EU countries. In Serbia, the project scope does not fall under Lists (Annexes) I or II of the Environmental Impact Assessment (EIA) law that lists the projects that mandatorily require (Annex I) or that may require (Annex II) an EIA. Similarly in Montenegro the project scope does not fall into the Lists (Annex) I or II of the EIA law, meaning that in both countries the Competent Authority does not make a decision as to whether a formal EIA is required. Were this project located within the EU, it would not fall under Annex I or Annex II of Directive 2011/92/EU amended by the Directive 2014/52/EU on the assessment of the effects of certain public and private projects on the environment (EIA Directive).

    The promoter shall implement the project in accordance with the procurement rules and procedures of the European Bank for Reconstruction and Development (EBRD) and in compliance with the requirements and standards that have been agreed between EBRD and the EIB for projects under a Project Implementation Agreement as foreseen in the Bank's Guide to Procurement. In particular, the Bank will require that calls for international tenders will be published in the OJEU in accordance with the Bank's Guide to Procurement.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Étapes
    À l'examen
    Approuvé
    Signé
    17 décembre 2024
    23 décembre 2024

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - AIR TRAFFIC CONTROL UPGRADE II
    Date de publication
    24 May 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    238122333
    Thématique du document
    Information Environnementale
    Numéro du projet
    20230860
    Secteur(s)
    Disponible au public
    Télécharger maintenant
    Autres liens

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes